Fabbed up a prototype bracket to hold the corrugated tube runs to the rear of the aircraft. Gonna need 8 of these for the two runs. Think it'll be a good project for Sam when he's home this weekend. One run will be to get the statictube forward and the pitot and AOA tubing aft. The other run will be for possible future wire needs. As you can see in the photo, a lot of nutplates were removed. Previous owner used the wrong type nutplates to secure the bottoms of the baggage panel. (K1100s) Plan to use leftover baffle scrap to make the brackets and pop rivet them to the seat and baggage floor ribs.