Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Jul 11, 2023     Corrugated tube mount - (1 hour)       Category: Avionics
Fabbed up a prototype bracket to hold the corrugated tube runs to the rear of the aircraft. Gonna need 8 of these for the two runs. Think it'll be a good project for Sam when he's home this weekend. One run will be to get the statictube forward and the pitot and AOA tubing aft. The other run will be for possible future wire needs. As you can see in the photo, a lot of nutplates were removed. Previous owner used the wrong type nutplates to secure the bottoms of the baggage panel. (K1100s) Plan to use leftover baffle scrap to make the brackets and pop rivet them to the seat and baggage floor ribs.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.